Scaffolding for projects that think big.

From large residential projects to commercial buildings and complex structures: Kontrimo supplies the scaffolding, the planning and the safety your site needs.

Part of Scaffor Group Stronger together within Scaffor Group
Scaffolding

It is still scaffolding.
The difference is the scale.

From a large villa to a fourteen-storey residential tower: Kontrimo builds the scaffolding for projects with a lot of surface, a lot of height and a lot of parties on site.

With a large stock of material, our own fleet and big teams we are there quickly — and we switch just as quickly when your planning shifts.

For which projects?

Three kinds of sites, the same scale.

Every site is different, but the question is often the same: plenty of scaffolding, properly planned and safely built.

large residential projects

From villa to residential tower.

commercial buildings

complex projects

Non-standard scaffolds for hard-to-reach or unusual structures.

Larger residential projects

From large villa to high apartment building.

Facade scaffolding for residential projects of every size: full walkarounds on large villas, phased scaffolding around apartment blocks and towers that grow floor by floor along with the shell.

Plenty of scaffolding surface, built in phases
Facade and finishes protected — that is safe working too
Usable by every contractor on site
Commercial buildings

Large volumes, tight windows.

Schools, offices, care buildings and public projects need large volumes of scaffolding within short time windows — a school facade goes up during the holidays, not during exams.

Large teams that erect and dismantle fast
Planning tuned to the people using the building
Entrances and passages safely screened off
Complex scaffolding

Not just straight facades.

Curved shapes, spans, free-standing towers and structures at great height: the higher and more complex, the more the preparation counts — and the more obvious safety becomes as a standard.

Structures built around the building and the work
Calculated for wind and load at height
Inspection and release before use

For specific engineering we bring in external technical support.

Technical possibilities

What is technically possible.

Four areas where the scale and experience of Kontrimo make the difference.

Great heights

Scaffolding well beyond standard work, with anchoring and wind calculations made to measure.

Free-standing & spans

Self-supporting structures and spans where the building offers no support.

Facade protection

Scaffolding that does not touch or damage the finished facade — protecting is part of building.

Access & passages

Stair towers, pedestrian passages and safe access for the site and its surroundings.

our approach

Well prepared is
safely carried out.

From the first conversation to dismantling: six steps with one common thread. Safety is not a separate phase — it is built into every step.

01
Discuss the project

You put your project to us and we think along from day one.

02
Visit & measure the site

Your project manager comes by: access, ground and surroundings.

03
Prepare

Scaffolding drawings and calculations, tuned to the building.

04
Planning & logistics

Material, teams and our own fleet tightly scheduled.

05
Erection & follow-up

Experienced teams, inspection and release per zone.

06
Dismantling

Taken down on your schedule, without getting in the way of the finishing.

In practice

This is what it looks like.

Residential

Scaffolding around a residential tower, 14 storeys

Ghent · Residential · Facade scaffolding

Challenge: building up floor by floor along with the shell, on a cramped city site.

Commercial

Scaffolding for a school building during the holidays

Antwerp · Commercial · Facade scaffolding

Challenge: erecting and dismantling a large volume of scaffolding within the short window of the school holidays.

Complex

Scaffolding for a bridge renovation

Infrastructure · Complex · Span

Challenge: a self-supporting structure where the building itself offers no support.

A project coming up?

Tell us about your site. We look at the project, think along about phasing and planning, and make a proposal that holds up — technically and logistically.