Good scaffolding starts before the first tube reaches the site.

Large sites run well because they are well prepared. On this page you see how Kontrimo goes about it: from understanding your site to the last lorry driving out.

Part of Scaffor Group Stronger together within Scaffor Group
01Understanding the site

First we understand the site.

Before anything is drawn or calculated, your project manager studies the project thoroughly — on the drawings and, where needed, on the site itself, with a visit and a survey.

Location
Height
Surroundings
Timing
Accessibility
Shape of the building
Execution
Phasing
02Experience on site

Not only from the drawing. From practice too.

A drawing does not say everything. Our project managers have spent years on sites and recognise what the paper does not show: how a site runs, where it can pinch and what the work really needs.

That practical experience goes into every proposal — and stays on the site, from erection to dismantling.

03Capacity & volume

Building big calls for big reserves.

Material, teams and transport in our own hands: that is how we handle large volumes — on several sites at the same time as well.

45.000
m³ of scaffolding material in stock
14
lorries in our own fleet
18
erection teams
9
large sites running at the same time
04Technical preparation

Thought through before anything is built.

Height, distances, unusual shapes: every scaffold is prepared around what the building and the work require.

Anchoring and build-up tuned to the building
Phasing of erection and dismantling
Accessible for every contractor working on it

For specific engineering we bring in external technical support — so every unusual structure rests on a calculated basis.

05Planning & logistics

Six questions we answer before your site asks them.

On a large site logistics is not a detail. Material, transport and timing are thought out in advance, together with you and the other parties on site.

01

When does the material arrive?

Deliveries scheduled against the site planning — not too early, never too late.

02

How does it get on site?

Our own fleet and transport, matched to the access to your site.

03

Where can it be unloaded?

Unloading and storage zones set in advance, on cramped city sites too.

04

Who is working meanwhile?

Coordination with the other contractors, so nobody comes to a halt.

05

When do we erect?

Phased erection that follows the rhythm of the shell.

06

When do we dismantle?

Dismantling on your schedule, without getting in the way of the finishing.

06Working safely

Safety sits in the way we work. Not in the margin.

Everything above — understanding, preparing, planning — is first of all safe working. On the site itself this is added concretely:

Preparation and risk analysis per site
Training for erectors and team leaders
Site inspection during and after erection
Fall protection during erection
Toolbox meetings on site
Correct use of material, checked per batch

A project coming up?

Tell us about your site. We look at the project, think along about phasing and planning, and make a proposal that holds up — technically and logistically.